Vesgantti Single Tri-fold Mattress | 10cm Gel Memory Foam Folding Bed

Vesgantti Single Tri-fold Mattress | 10cm Gel Memory Foam Folding Bed

£126.90
Sale price  £126.90 Regular price 
Skip to product information
Vesgantti Single Tri-fold Mattress | 10cm Gel Memory Foam Folding Bed

Vesgantti Single Tri-fold Mattress | 10cm Gel Memory Foam Folding Bed

£126.90
Sale price  £126.90 Regular price 

Shipping options and cost are calculated at checkout.

Delivery available to the UK and internationally where offered for each product.

Typical dispatch lead time is about 35 business days where that rate appplies.

Shipping PolicyReRefund Policy

Unexpected guests or limited living space often turn hosting into a stressful scramble for extra bedding. You likely know the frustration of bulky air mattresses that leak or uncomfortable sofa cushions that leave you waking up with a stiff back.

Imagine instead having a sophisticated, space-saving solution that transforms any room into a comfortable guest suite in seconds. With the Vesgantti Tri-Fold Mattress, you can offer your visitors a premium sleep experience that feels like a real bed, then tuck it away effortlessly when the morning comes.

This Portable Bed acts as the perfect bridge between convenience and luxury. It features a 10cm dual-layer design, combining 3cm of cooling gel-infused Memory Foam with 7cm of high-density base foam for superior support. Whether you are camping, hosting, or creating a cozy reading nook, this mattress adapts to your needs:

  • Multifunctional: Easily folds into a sofa position for gaming or lounging.
  • Travel-Ready: Includes a durable storage bag for simple transport and compact storage.
  • Easy Maintenance: Features a breathable, skin-friendly cover that is removable and machine washable.
  • Stable Design: Equipped with a non-slip bottom to ensure it stays securely in place.

Experience the perfect blend of comfort and practicality with Vesgantti, available now at Jolof Store.

You may also like