Vesgantti Small Single Hybrid Mattress | 10.6 Inch Pillow Top Pocket Sprung

Vesgantti Small Single Hybrid Mattress | 10.6 Inch Pillow Top Pocket Sprung

£1,500.00
Prezzo promozionale  £1,500.00 Prezzo di listino 
Passa alle informazioni sul prodotto
Vesgantti Small Single Hybrid Mattress | 10.6 Inch Pillow Top Pocket Sprung

Vesgantti Small Single Hybrid Mattress | 10.6 Inch Pillow Top Pocket Sprung

£1,500.00
Prezzo promozionale  £1,500.00 Prezzo di listino 

Finding the right sleep surface for your child is essential for their growth and comfort. The Vesgantti Small Single Hybrid Mattress offers a perfect balance of support and softness, making it an ideal upgrade for kids' beds, bunk beds, or guest rooms.

  • Feature: 10.6 Inch Pillow Top Design – The swirled button-tufted cover includes 2.5cm of egg-shaped foam that contours to the body → Benefit: Your child enjoys a plush, cloud-like sleeping surface that helps them settle down faster.
  • Feature: Individual Pocket Sprung System – Hundreds of independent springs provide zoned support that reacts to movement → Benefit: It absorbs noise and vibration, ensuring your child stays asleep even if they toss and turn.
  • Feature: High-Density Hybrid Layers – The combination of foam and springs promotes superior airflow and heat distribution → Benefit: Your little one stays cool and comfortable throughout the night, regardless of the season.
  • Feature: Compressed Mattress-in-a-Box – The mattress arrives rolled for easy transport and setup in tight spaces → Benefit: You can effortlessly move and install the bed in any room, from lofts to apartments.

Experience the peace of mind that comes with a 100-Nights Trial and a 10-Year warranty, ensuring your child gets the restful sleep they deserve.

You may also like