{"product_id":"true-hq-4k-hdmi-cable-15m-high-speed-18gbps-hdmi-2-0-4k-60hz-ultra-hd-with-hdr10-arc-hdcp-2-2-and-ethernet-long-lead-for-tv-projector","title":"15m 4K HDMI Cable – High Speed 18Gbps HDMI 2.0 Lead","description":"\u003cp\u003e\u003c\/p\u003e\u003cp\u003eIf you are looking for a reliable way to connect your devices over a long distance without losing signal quality, this 15m HDMI cable from Jolof Store is the perfect solution. It ensures your home entertainment setup remains crisp and responsive, whether you are gaming or streaming your favorite movies.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eFeature:\u003c\/strong\u003e High Speed 18Gbps bandwidth – This HDMI 2.0 standard supports massive data transfer rates → \u003cstrong\u003eBenefit:\u003c\/strong\u003e You get smooth, lag-free performance for your high-resolution content.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFeature:\u003c\/strong\u003e 4K@60Hz Ultra HD with HDR10 – The cable delivers vibrant colors and sharp details at high frame rates → \u003cstrong\u003eBenefit:\u003c\/strong\u003e Your visuals look lifelike and immersive on any compatible TV, monitor, or projector.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFeature:\u003c\/strong\u003e ARC and HDCP 2.2 support – These protocols ensure seamless audio return and secure content streaming → \u003cstrong\u003eBenefit:\u003c\/strong\u003e You can enjoy high-quality sound and protected media without any compatibility headaches.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFeature:\u003c\/strong\u003e 15m length with Ethernet – The extended reach allows for flexible room layouts while maintaining network connectivity → \u003cstrong\u003eBenefit:\u003c\/strong\u003e You can easily connect your PS5, Xbox, or PC across the room without sacrificing speed.\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003eUpgrade your connection today with this high-performance lead to experience the full potential of your display equipment.\u003c\/p\u003e","brand":"Jolof Store","offers":[{"title":"Default Title","offer_id":53477949014359,"sku":"B07TK44BL7","price":31.31,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1014\/0585\/1991\/files\/71hcDwF2WUL.jpg?v=1778007033","url":"https:\/\/altoe.co.uk\/it\/products\/true-hq-4k-hdmi-cable-15m-high-speed-18gbps-hdmi-2-0-4k-60hz-ultra-hd-with-hdr10-arc-hdcp-2-2-and-ethernet-long-lead-for-tv-projector","provider":"ALTOE","version":"1.0","type":"link"}