{"product_id":"3m-charger-for-iphone-17-16-16e-15-2pack20w-fast-charging-cable-usb-c-to-usb-c-charger-cord-uk-plug-adapter-long-lead-for-iphone-17-air-16-pro","title":"MCCRH 20W USB C Fast Charger with 3m Cable for iPhone 17 16 15 | 2 Pack","description":"\u003cp\u003e\u003c\/p\u003e\u003cp\u003eStop hovering near wall outlets and enjoy the freedom of a 3m cable that keeps your devices powered up anywhere in the room. This MCCRH provides the reliable, high-speed performance you need for your daily tech essentials.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eFeature:\u003c\/strong\u003e 3m Cable length – Provides extra reach compared to standard cords → \u003cstrong\u003eBenefit:\u003c\/strong\u003e You can comfortably use your phone or tablet while lounging on the couch or working at your desk without being tethered to the wall.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFeature:\u003c\/strong\u003e 20W PD 3.0 Fast Charging – Delivers efficient power to compatible devices → \u003cstrong\u003eBenefit:\u003c\/strong\u003e You save valuable time, as this setup can charge your iPhone 17\/16\/15 series to 80% in just 30 minutes.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFeature:\u003c\/strong\u003e Universal USB-C Compatibility – Works with a wide range of devices including iPhone 17, 16, 15, iPad Pro, Samsung Galaxy, and Google Pixel series → \u003cstrong\u003eBenefit:\u003c\/strong\u003e You can simplify your life by using one high-quality cable solution for all your modern electronics.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFeature:\u003c\/strong\u003e 480Mbps Data Transfer – Supports rapid file syncing alongside power delivery → \u003cstrong\u003eBenefit:\u003c\/strong\u003e You get a versatile tool that handles both charging and data management with ease.\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003eUpgrade your charging setup today with this durable, long-reach designed to keep your devices ready whenever you are.\u003c\/p\u003e","brand":"Jolof Store","offers":[{"title":"Default Title","offer_id":53475114746199,"sku":"B0F93V7XTT","price":30.11,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1014\/0585\/1991\/files\/51Il9HV-qdL.jpg?v=1777987283","url":"https:\/\/altoe.co.uk\/it\/products\/3m-charger-for-iphone-17-16-16e-15-2pack20w-fast-charging-cable-usb-c-to-usb-c-charger-cord-uk-plug-adapter-long-lead-for-iphone-17-air-16-pro","provider":"ALTOE","version":"1.0","type":"link"}